
Ref. 2260 — Ae 4/4 I and II, Re 4/4 and Ae 8/8 — BLS — No. 262
Ae 4/4 I and II, Re 4/4 and Ae 8/8
Switzerland — Scale H0 (1:87)
"A pioneer celebrates: 100 years of the Lötschberg Railway." To mark the BLS's jubilee year, the universal Ae 4/4 (Re 4/4) locomotive, which contributed to the BLS's success, has been reproduced in a small series. The rectifier locomotives delivered at the end of 1964 (built by SLM/BBC) already met the specification during the first test runs. With a total weight of only 80 tonnes, the locomotive is able to handle the entire haulage program of the Ae 6/8 and Ae 6/6, but with considerably less maintenance. In all, 35 machines of this type were delivered to the BLS. Because of a muddle of numbers in the BLS fleet, the machines were renumbered Re 4/4 from 1969; a little later the locomotives received municipality names with coats of arms.
Read the full story ↓| Company | Type | Running number | Livery | Ref. |
|---|---|---|---|---|
| BLS | Ae 4/4 II | 262 | red | 2260 |
| BLS | Ae 4/4 I | 252 | black | 2262 |
| BLS | Ae 4/4 I | 253 | gray & orange & red | 2262/1 |
| BLS | Ae 4/4 I | 251 | red | 2262/2 |
| BLS | Ae 8/8 | 273 | red | 2261 |
| BLS | Ae 8/8 | 271 | red | 2261/1 |
| BLS | Re 4/4 | 163 | red | 2260/1 |
| BLS | Re 4/4 | 177 | red | 2260/2 |
| BLS | Re 4/4 | 194 | red | 2260/3 |
"A pioneer celebrates: 100 years of the Lötschberg Railway." To mark the BLS's jubilee year, the universal Ae 4/4 (Re 4/4) locomotive, which contributed to the BLS's success, has been reproduced in a small series. The rectifier locomotives delivered at the end of 1964 (built by SLM/BBC) already met the specification during the first test runs. With a total weight of only 80 tonnes, the locomotive is able to handle the entire haulage program of the Ae 6/8 and Ae 6/6, but with considerably less maintenance. In all, 35 machines of this type were delivered to the BLS. Because of a muddle of numbers in the BLS fleet, the machines were renumbered Re 4/4 from 1969; a little later the locomotives received municipality names with coats of arms.
To raise the trailing load of 900 tonnes, the BLS chose a rather unconventional solution: coupling two Ae 4/4s together created the Ae 8/8. Five of these double locomotives were running on the BLS network in 1966.
