Fulgurex — Precision Models
Ce 4/6 and Ce 4/4 — scale H0 (1:87)

Ref. 2224 — Ce 4/6 and Ce 4/4 — BLS — No. 307

Ce 4/6 and Ce 4/4

Switzerland — Scale H0 (1:87)

In the 1920s the BLS (Bern – Lötschberg – Simplon), like many other railway companies, had to contend with the general coal shortage. Only the mountain line from Thun to Brig was already electrified at the time, and it had proved its worth. A "Bernese decree" therefore ordered the fastest possible electrification of the lines of the Bernese decree railways; for the BLS this concerned the Spiez – Interlaken section. Opposition was strong, as the project required a great deal of capital that the BLS did not have. At the same time as the works, 14 locomotives of the Ce 4/6 type were ordered; because of the financial situation they soon earned the popular nickname "Dekretsmühle" ("decree mill").

Read the full story ↓
Versions offered
CompanyTypeRunning numberLiveryRef.
BLSCe 4/6307brown2224
BLSCe 4/6315brown2224/1
BLSCe 4/6312brown2224/2
BLSCe 4/4309brown2225
Sold out
In detail

In the 1920s the BLS (Bern – Lötschberg – Simplon), like many other railway companies, had to contend with the general coal shortage. Only the mountain line from Thun to Brig was already electrified at the time, and it had proved its worth. A "Bernese decree" therefore ordered the fastest possible electrification of the lines of the Bernese decree railways; for the BLS this concerned the Spiez – Interlaken section. Opposition was strong, as the project required a great deal of capital that the BLS did not have. At the same time as the works, 14 locomotives of the Ce 4/6 type were ordered; because of the financial situation they soon earned the popular nickname "Dekretsmühle" ("decree mill").

The specification required a maximum axle load of only 12.5 tonnes and a speed of 65 km/h, for freight and passenger work and possibly shunting. The mechanical part of the machines delivered from 1920 came from SLM; MFO was responsible for the electrical equipment of the first seven, after which BBC supplied the electrical components. In 1924 a further 3 locomotives were ordered, bringing the number to 17. From 1954, at their main overhaul, nos. 308 to 317 were converted to Ce 4/4 by removing the leading axles, and their bogies were given a central short coupling so that tractive forces no longer passed through the body.

With the exception of Ce 4/6 no. 307, lovingly restored and maintained as a historic vehicle, these locomotives have disappeared. Ce 4/6 no. 307 is now at the BLS depot in Spiez and is occasionally used for special trips.